尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier
China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier China Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier - China Supplier

Flood Control and Emergency Rescue Aluminum Alloy FRP Flood Barrier

Price:Negotiable
Industry Category: Metallurgy & Minerals/Non-Ferrous Processed Materials/Non-Ferrous Metal Sheets
Product Category:
Brand: 冀虹
Spec: WX-2013


Contact Info
  • Add:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

Main specifications of the prefabricated folding plate dam flood control sub-dike:
Per set: 10m
Unit width of sub-dike: 1m
Applicable dike materials: sandy loam, loam, clay
Design wind speed: 6.0m/s
Design river width/wave height: 4km/0.3m
Gross weight: 286kg
Net weight: 235kg
Construction speed: 60 minutes for 100 people/km
Structural principle of the prefabricated folding plate dam flood control sub-dike
1. Structural composition and function
Main components of the prefabricated folding plate dam flood control sub-dike:
(1) Corner frame: Made of aluminum alloy profiles connected by shafts, serving as the support framework of the dam body.
(2) Crossbeam: Composed of aluminum alloy square materials connected by **joints, acting as the connecting support members of the dam body.
(3) Water-retaining panel: Made of corrugated fiberglass material, quickly linked via hinges and connected to the crossbeam as a whole through **fixing devices.
Its functions: first, as a connector to link adjacent corner frames, forming the load-bearing carrier of the dam body;
second, as a rigid connecting plate.
(4) Rubber elastomer: Made of high-quality rubber with elastic functionality, used for sealing and water retention between adjacent support panels.
(5) Positioning fixing pile: Formed by pressing round steel.
2. Working principle
The prefabricated folding plate dam flood control sub-dike applies the principle of face rockfill dams in hydraulic engineering. Multiple corner frames, crossbeams, and water-retaining panels are connected to form a rigid sub-dike body, with the water-retaining panels serving the water-blocking function of a face rockfill dam. During construction, it is embedded into the dike foundation soil to prevent seepage around the structure.

Industry Category Metallurgy & Minerals/Non-Ferrous Processed Materials/Non-Ferrous Metal Sheets
Product Category
Brand: 冀虹
Spec: WX-2013
Stock: 9999
Manufacturer:
Origin: China / Hebei / Shijiazhuangshi
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 巩留县| 肥乡县| 璧山县| 江永县| 龙南县| 鹤峰县| 乌拉特前旗| 临泉县| 炉霍县| 长沙县| 二连浩特市| 巨鹿县| 太保市| 灵川县| 六盘水市| 彰化市| 海林市| 通城县| 赫章县| 文水县| 宣恩县| 调兵山市| 南漳县| 安宁市| 宁夏| 阳谷县| 海林市| 睢宁县| 承德县| 青浦区| 祁门县| 武夷山市| 荥阳市| 永顺县| 互助| 醴陵市| 双柏县| 垣曲县| 吉林省| 天全县| 新竹市|