China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier China Structure and Working Principle of Prefabricated Flood Control Sub-dike - China Supplier

Structure and Working Principle of Prefabricated Flood Control Sub-dike

Price:1 /套
Industry Category: Interwoven Fabric
Product Category:
Brand: 冀虹
Spec: WX-2013


Contact Info
  • Add:長安區(qū)東勝廣場B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

I. Purpose of Hebei Five-Star Power Equipment Co., Ltd.'s Flood Control Sub-Dike
[Five-Star] The assembled panel dam flood control sub-dike is primarily used for emergency flood control and embankment reinforcement on soft and hard embankments such as sandy loam, loam, clay, concrete, and asphalt.
II. Main Features of the Flood Control Sub-Dike
Hebei Five-Star Power Equipment Co., Ltd.'s [Five-Star] assembled panel dam flood control sub-dike is a new, fast, economical, and environmentally friendly disaster prevention and mitigation device that breaks through traditional thinking modes and abandons conventional dike-building materials and techniques. It features water control using water, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation with low cost; recyclable and reusable, green and environmentally friendly, among other characteristics.
III. Main Specifications of the Assembled Panel Dam Flood Control Sub-Dike
1. Sub-dike dimensions: 1.2 m * 10 m;
2. Sub-dike unit width: 1 m;
3. Applicable embankment types: sandy loam, loam, clay/concrete, asphalt;
4. Sub-dike height: 1.30/1.35 m;
5. Water retention height: 1.0 m;
6. Original embankment top width: 4.0 m or more;
7. Safety factor k: 2.0-3.35;
8. Design wind speed: 6.0 m/s;
9. Design river width/wave height: 4 km/0.3 m;
10. Gross weight: 260 kg;
11. Net weight: 225 kg;
12. Construction speed: 60 minutes for 100 people/km
IV. Structural Principle of the Assembled Panel Dam Flood Control Sub-Dike
1. Structure and Function of [Five-Star] Assembled Panel Dam Flood Control Sub-Dike
[Five-Star] assembled panel dam flood control sub-dike mainly consists of two parts:
(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by axles, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. Beam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support rod of the dam body.
(2) Foldable water-retaining panel: [Five-Star] exclusively developed foldable water-retaining panels are connected into a whole using connecting axles between panels. When not in use, multiple panels can be folded together to reduce space. When in use, they can be instantly unfolded to increase assembly speed. The foldable water-retaining panels are made of corrugated fiberglass materials or specially made color steel plates, aluminum alloy plates, and waterproof PVC plates, which are connected to the beams as a whole through special fixing devices. Their functions: first, as connectors to link adjacent angle frames to form the load-bearing carrier of the dam body; second, as rigid connecting plates. The bottom of the panels is equipped with positioning fixing piles, formed by pressed round steel. Depending on the embankment foundation, there are two usage methods: when applied on soft embankment foundations, they are inverted in the trench to resist displacement; when applied on hard embankment foundations, they serve as positioning water-retaining anti-seepage plates and compacted water-stop elastomers.
V. Working Principle of Hebei Five-Star Power Equipment Co., Ltd.'s Assembled Panel Dam Flood Control Sub-Dike
[Five-Star] assembled panel dam flood control sub-dike adopts the principle of panel dams in hydraulic engineering. It forms a rigid sub-dike body by connecting and fastening multiple angle frames, beams, foldable water-retaining support panels, and other components. The water-retaining support panels function as the water-retaining panels in panel dams. 

Industry Category Interwoven Fabric
Product Category
Brand: 冀虹
Spec: WX-2013
Stock: 9999
Manufacturer:
Origin: China / Hebei / Shijiazhuangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 马公市| 浦江县| 五河县| 宿州市| 靖江市| 宁津县| 钟山县| 长汀县| 高青县| 江北区| 高青县| 天镇县| 台中市| 鄂州市| 鄂州市| 多伦县| 天津市| 始兴县| 杭锦旗| 建水县| 杭锦旗| 纳雍县| 锡林浩特市| 南投县| 仙居县| 津市市| 麦盖提县| 潜山县| 丰顺县| 承德市| 潜江市| 南和县| 东宁县| 德清县| 长泰县| 信丰县| 凤山县| 监利县| 获嘉县| 九龙坡区| 盐亭县|