尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Sauna Room Construction and Installation - China Supplier
China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier

Sauna Room Construction and Installation

Price:¥199
Industry Category: Sports & Recreation/Sauna & Foot Bath Equipment/Sauna & Foot Spa Equipment
Product Category:
Brand: 長春中野汗蒸設備
Spec: 長春中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Changchun Sauna Room, Dehui Beauty Sauna Spa, Jiutai Fire Dragon Bath, Yushu Tourmaline, Nongan Bathing and Sauna

Detailed Construction Process of Changchun Sauna Room
1. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
2. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Mongolian Scotch Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
3. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden龍骨 fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
4. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rise from 20°C to 55°C, may be slightly slower immediately after construction, please wait patiently.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
5. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Recreation/Sauna & Foot Bath Equipment/Sauna & Foot Spa Equipment
Product Category
Brand: 長春中野汗蒸設備
Spec: 長春中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Jilin / Changchunshi
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 黄平县| 丰顺县| 玉田县| 巩义市| 成安县| 商洛市| 文化| 称多县| 寻乌县| 布尔津县| 炉霍县| 融水| 大关县| 绵阳市| 宿松县| 博白县| 尖扎县| 吕梁市| 达尔| 富阳市| 通渭县| 马尔康县| 伊宁市| 仲巴县| 吉木乃县| 安陆市| 洛宁县| 胶南市| 北川| 景谷| 阳西县| 随州市| 宁德市| 睢宁县| 大埔县| 横峰县| 科技| 庐江县| 达日县| 虹口区| 阿坝县|