尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Sauna Room Construction and Installation - China Supplier
China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier

Sauna Room Construction and Installation

Price:¥199
Industry Category: Sports & Entertainment
Product Category:
Brand: 長春中野汗蒸設(shè)備
Spec: 長春中野汗蒸設(shè)備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號(hào), Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Changchun Sauna Room, Dehui Beauty Sauna Spa, Jiutai Fire Dragon Bath, Yushu Tourmaline, Nongan Bathing and Sauna

Detailed Construction Process of Changchun Sauna Room
1. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
2. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Mongolian Scotch Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
3. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden龍骨 fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
4. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rise from 20°C to 55°C, may be slightly slower immediately after construction, please wait patiently.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
5. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 長春中野汗蒸設(shè)備
Spec: 長春中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Jilin / Changchunshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 陆良县| 西丰县| 小金县| 新巴尔虎右旗| 台南县| 扶沟县| 平利县| 平利县| 扶沟县| 定州市| 涟源市| 利辛县| 平昌县| 柳林县| 云阳县| 扶余县| 凤凰县| 阿合奇县| 千阳县| 张家口市| 青铜峡市| 改则县| 武乡县| 休宁县| 武夷山市| 乌鲁木齐县| 玉林市| 洪雅县| 镇远县| 望谟县| 仁化县| 阳江市| 牟定县| 类乌齐县| 楚雄市| 南江县| 长寿区| 大余县| 莱芜市| 望都县| 三原县|