尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Construction of Sauna and Steam Rooms - China Supplier
China Construction of Sauna and Steam Rooms - China Supplier China Construction of Sauna and Steam Rooms - China Supplier China Construction of Sauna and Steam Rooms - China Supplier

Construction of Sauna and Steam Rooms

Price:¥199
Industry Category: Others
Product Category:
Brand: 松原中野汗蒸設(shè)備
Spec: 松原中野汗蒸設(shè)備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Songyuan Sauna Room, Changling Beauty Sauna Spa, Qian'an Fire Dragon Bath, Fuyu Tourmaline, Qianguoer Bathing and Sauna

Detailed Construction Process of Songyuan Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; it may be slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Open the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Others
Product Category
Brand: 松原中野汗蒸設(shè)備
Spec: 松原中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Jilin / Songyuanshi
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 黄龙县| 乌审旗| 永川市| 同德县| 松原市| 民乐县| 贡山| 电白县| 汤原县| 宕昌县| 赤水市| 稷山县| 四川省| 新源县| 依安县| 湘阴县| 菏泽市| 巴林右旗| 冕宁县| 南溪县| 婺源县| 房产| 朝阳市| 偏关县| 丰镇市| 普格县| 寻乌县| 运城市| 安远县| 桦南县| 南京市| 盈江县| 东台市| 清镇市| 大埔区| 洪江市| 宜宾市| 紫金县| 泸定县| 阿荣旗| 厦门市|