尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Construction of Sauna and Steam Rooms - China Supplier
China Construction of Sauna and Steam Rooms - China Supplier China Construction of Sauna and Steam Rooms - China Supplier China Construction of Sauna and Steam Rooms - China Supplier

Construction of Sauna and Steam Rooms

Price:¥199
Industry Category: Sports & Entertainment
Product Category:
Brand: 松原中野汗蒸設(shè)備
Spec: 松原中野汗蒸設(shè)備


Contact Info
  • Add:沈陽(yáng)市鐵西區(qū)興順街99號(hào), Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Songyuan Sauna Room, Changling Beauty Sauna Spa, Qian'an Fire Dragon Bath, Fuyu Tourmaline, Qianguoer Bathing and Sauna

Detailed Construction Process of Songyuan Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; it may be slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Open the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 松原中野汗蒸設(shè)備
Spec: 松原中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Jilin / Songyuanshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Me 襄樊市| 轮台县| 河南省| 广东省| 巴南区| 竹山县| 错那县| 喀什市| 昭觉县| 清水河县| 邯郸市| 铜梁县| 阜康市| 盖州市| 怀宁县| 绥滨县| 新乡市| 郑州市| 江山市| 连城县| 松溪县| 枣庄市| 昔阳县| 武山县| 大姚县| 蚌埠市| 宝山区| 东光县| 米林县| 天长市| 华坪县| 密山市| 常宁市| 彭水| 永顺县| 清苑县| 渝北区| 辽中县| 金塔县| 深州市| 平遥县|