尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Construction and Installation of Sauna and Steam Rooms - China Supplier
China Construction and Installation of Sauna and Steam Rooms - China Supplier China Construction and Installation of Sauna and Steam Rooms - China Supplier China Construction and Installation of Sauna and Steam Rooms - China Supplier

Construction and Installation of Sauna and Steam Rooms

Price:¥199 /㎡
Industry Category: Others
Product Category:
Brand: 錦州中野汗蒸設(shè)備
Spec: 錦州中野汗蒸設(shè)備


Contact Info
  • Add:沈陽(yáng)市鐵西區(qū)興順街99號(hào), Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Jinzhou Sauna Room, Beizhen Beauty Salon Sauna, Heishan Fire Dragon Bath, Yi County Tourmaline, Linghai Electric Heated Kang

Detailed Construction Process of Jinzhou Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Home use (3-8㎡), commercial use (15-50㎡), or comprehensive wellness centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared sauna rooms (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt therapy sauna rooms (Himalayan salt bricks + negative ion system)
Jade sauna rooms (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fire Rating B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Pine (Home Use), Salt Bricks Moisture Content ≤12%, No Formaldehyde Emission


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer installation.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Open the door after daily use to release moisture.
Wipe the decorative surface monthly with a slightly damp cloth.

Industry Category Others
Product Category
Brand: 錦州中野汗蒸設(shè)備
Spec: 錦州中野汗蒸設(shè)備
Stock: 999
Manufacturer:
Origin: China / Liaoning / Jinzhoushi
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 淮安市| 呼玛县| 许昌市| 襄汾县| 福清市| 融水| 定西市| 布尔津县| 吴旗县| 石台县| 玉树县| 江源县| 长岛县| 兴安县| 堆龙德庆县| 乌拉特后旗| 濮阳市| 河池市| 工布江达县| 恭城| 北安市| 张家港市| 安陆市| 云浮市| 南安市| 浮梁县| 镇宁| 龙井市| 辽宁省| 新建县| 武胜县| 铜陵市| 涿州市| 龙陵县| 抚顺市| 霞浦县| 通化市| 舟曲县| 临江市| 东安县| 吴旗县|