尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Construction of Sauna Room Design and Installation - China Supplier
China Construction of Sauna Room Design and Installation - China Supplier China Construction of Sauna Room Design and Installation - China Supplier China Construction of Sauna Room Design and Installation - China Supplier

Construction of Sauna Room Design and Installation

Price:¥199 /㎡
Industry Category: Sports & Entertainment
Product Category:
Brand: 通遼中野汗蒸設備
Spec: 通遼中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Tongliao Hanjimjilbang, Kailu Sauna, Kulun Fire Dragon Bath, Naiman Banner Tourmaline, Jarud Banner Beauty Sauna, Horqin Bath and Sauna, Huolin Gol City Ganbanyoku

Detailed Construction Process of Tongliao Hanjimjilbang
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Residential (3-8㎡), Commercial (15-50㎡), or Comprehensive Wellness Centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna (heated by far-infrared light wave tubes/cables, temperature 40-60°C)
Salt Therapy Sauna (Himalayan salt bricks + negative ion system)
Jade Sauna (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer XPS Board Thickness ≥2cm, Fireproof Grade B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Residential), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-Infrared Sauna as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer setup.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction boxes for thermostats.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, protective base layer.
Decoration Work: Sauna exterior finishing (leave 2mm expansion gaps), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature probes (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance ≥50MΩ measured with megohmmeter, leakage current <0.75mA.
Energy Efficiency Assessment: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Entertainment
Product Category
Brand: 通遼中野汗蒸設備
Spec: 通遼中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Inner Mongolia / Tongliaoshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Me 舞阳县| 土默特右旗| 深水埗区| 鄂托克前旗| 临安市| 磐安县| 康平县| 弥勒县| 太仓市| 武陟县| 华阴市| 太湖县| 福州市| 炉霍县| 德化县| 买车| 商都县| 稷山县| 桐庐县| 本溪市| 博爱县| 社旗县| 英山县| 讷河市| 东方市| 天全县| 和顺县| 连南| 永宁县| 古蔺县| 商水县| 江川县| 虎林市| 梁河县| 洛浦县| 茌平县| 通道| 长海县| 曲麻莱县| 庆云县| 定日县|