尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Sauna Room Construction and Installation - China Supplier
China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier China Sauna Room Construction and Installation - China Supplier

Sauna Room Construction and Installation

Price:¥199
Industry Category: Sports & Recreation/Sauna & Foot Bath Equipment/Sauna & Foot Spa Equipment
Product Category:
Brand: 吉林中野汗蒸設備
Spec: 吉林中野汗蒸設備


Contact Info
  • Add:沈陽市鐵西區(qū)興順街99號, Zip:
  • Contact: 周鋼
  • Tel:15998823135
  • Email:1304239360@qq.com

Other Products

Description
Additional Information

Jilin Sauna Room, Jiaobe Beauty Sauna Spa, Huadian Fire Dragon Bath, Shulan Tourmaline, Panshi, Yongji Bathing Sauna

Detailed Construction Process of Jilin Sauna Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Home use (3-8㎡), commercial use (15-50㎡), or comprehensive wellness centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Sauna Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Sauna Room (Himalayan salt bricks + negative ion system)
Jade Sauna Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List

Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fireproof Grade B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Home Use), Salt Bricks Moisture Content ≤12%, Formaldehyde-Free


Auxiliary Equipment

Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Temperature Fuse (automatic power cutoff at 70°C).
III. Construction Process (Using Far-Infrared Sauna Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for thermostat.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Sauna exterior finishing (leave 2mm expansion joints), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Evaluation: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Guidelines
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.

Industry Category Sports & Recreation/Sauna & Foot Bath Equipment/Sauna & Foot Spa Equipment
Product Category
Brand: 吉林中野汗蒸設備
Spec: 吉林中野汗蒸設備
Stock: 999
Manufacturer:
Origin: China / Jilin / Jilinshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 游戏| 宜州市| 姚安县| 牟定县| 金堂县| 宜阳县| 田林县| 宣化县| 霸州市| 杭锦后旗| 贵州省| 英超| 高雄市| 育儿| 平罗县| 阿克陶县| 文水县| 保德县| 乌苏市| 沁水县| 奎屯市| 望谟县| 益阳市| 锡林浩特市| 巴彦淖尔市| 灵武市| 商丘市| 赤城县| 光山县| 依安县| 蓬安县| 永春县| 临夏县| 上高县| 嘉峪关市| 沅陵县| 桦甸市| 南岸区| 突泉县| 巩义市| 丹凤县|