Tunnel vault mold-attached grouting rapid-flow mortar, tunnel vault micro-expansion grouting cement

Price:¥4 /m
Industry Category: Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category:
Brand: 中大恒建
Spec: 25


Contact Info

Other Products

Description
Additional Information

Grouting is performed using a dedicated integrated grout preparation and injection machine. The grouting material features micro-expansion, high fluidity, early strength, no bleeding, and extended operability. It not only fills voids but also compensates for or repairs defects in the secondary lining concrete, thereby enhancing the overall quality of the lining concrete.

II. Characteristics of the Tunnel Arch Crown Grouting Process with Formwork:

1. The top of the secondary lining formwork is pre-embedded with grouting pipes and grout vent holes, which also serve as inspection holes to check the fullness of the arch crown concrete.

2. The grouting equipment includes WX-RPC grouting pipes (hereinafter referred to as RPC pipes), micro-expansion slow-setting early-strength filling mortar, and an integrated grout preparation and injection machine. The equipment is simple, easy to move, and operate.

3. The operation is straightforward; grouting for one section of the secondary lining takes only about 2 hours and does not interfere with the normal secondary lining construction schedule.

4. Grouting with formwork can begin when the concrete initially sets. The grouting pressure is significantly higher than that applied after formwork removal, improving the integrity between the lining concrete and the grout, and repairing various concrete defects.

5. During grouting with formwork, the secondary lining concrete is protected by the trolley formwork and remains undamaged. Typically, the concrete pouring pressure exceeds 6 MPa, while the grouting pressure generally does not exceed 1.0 MPa.

III. Key Points of the Tunnel Arch Crown Grouting Process with Formwork:

1. The construction process involves pre-embedding radial grouting pipes in the trolley. Grouting is performed through these pipes promptly 2 hours after the secondary lining construction is completed. The operation can be carried out using a dedicated integrated grout preparation and injection machine. The grouting material exhibits micro-expansion, high fluidity, early strength, no bleeding, and slow-setting properties. It not only serves to fill voids but also compensates for or repairs defects in the secondary lining concrete.

Industry Category Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category
Brand: 中大恒建
Spec: 25
Stock: 32321
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 顺义区| 游戏| 梧州市| 江城| 伊春市| 民权县| 肇州县| 赤峰市| 高平市| 城市| 九江市| 公安县| 安远县| 大丰市| 宁国市| 木里| 丰顺县| 怀仁县| 云南省| 夏邑县| 肃宁县| 渭源县| 安义县| 石渠县| 辽宁省| 昭觉县| 漠河县| 和顺县| 饶平县| 邯郸市| 汤阴县| 金平| 绍兴县| 云南省| 金乡县| 顺义区| 闽清县| 从化市| 固安县| 东丰县| 永定县|