尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier
China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier China Shield synchronous grouting material for subway shield segment synchronous grouting - China Supplier

Shield synchronous grouting material for subway shield segment synchronous grouting

Price:¥55 /m
Industry Category: Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category:
Brand: 中大恒建
Spec: 20


Contact Info

Other Products

Description
Additional Information

A dry mixture processed from graded dry aggregates, cementitious materials, fillers, admixtures, etc., used for shield grouting engineering.

Shield synchronous grouting material, when mixed with water in a certain proportion and stirred into a uniform slurry, is used alone or with supporting components for backfill grouting behind the shield. Its purpose is to effectively control ground settlement during shield construction, ensure the early stability of the segment lining, and form the first line of defense for lining waterproofing.

I. Product Features

1. High fluidity and excellent filling performance.

2. Cures within a specified time and is not diluted by groundwater before curing.

3. Construction is not restricted by site conditions, with simple procedures, allowing parallel work with other trades, easy operation, and fast construction speed.

II. Scope of Application

Tunnel shield construction, rail transit, stations, etc.

III. Performance Indicators

Note: Shield synchronous grouting material complies with the standard: DB11T 1608-2018 "Technical Specification for Application of Ready-Mixed Shield Grouting Material".

IV. Construction Process

1. During grouting, the shield tail gap should be completely filled and compacted, with a filling coefficient not less than 1.3.

2. The grouting pressure should match the ground stress at the burial depth of the tunnel axis, and the pressure should be uniform.

3. Type I slurry (thin slurry) should be used up within the apparent setting time, and Type II slurry (thick slurry) should be used up within the initial setting time.
Winter Construction

1. Comprehensive measures should be taken during winter construction to ensure slurry quality, and a suitable winter construction plan should be in place.

2. Fluid pipelines such as water tanks and water pipes matched with the mixing machine should be insulated.

3. The slurry pipelines from the mixing machine to the storage tank, as well as the storage tank itself, should be insulated.

4. During winter construction, after each operation, water in equipment and pipelines should be drained promptly to avoid freezing and damaging the equipment.

Industry Category Construction & Building Materials/Cement/Cement & Cementitious Materials
Product Category
Brand: 中大恒建
Spec: 20
Stock: 19
Manufacturer:
Origin: China / Beijing / Tongzhouqu
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 曲麻莱县| 岱山县| 鹤峰县| 子洲县| 广宁县| 安陆市| 新平| 长泰县| 怀集县| 民乐县| 平舆县| 江安县| 洪雅县| 廊坊市| 信丰县| 斗六市| 元朗区| 陈巴尔虎旗| 金华市| 古交市| 加查县| 丰台区| 晋江市| 栾川县| 和平县| 南京市| 福清市| 邹平县| 南漳县| 巧家县| 忻城县| 城口县| 汝城县| 大邑县| 兴业县| 甘孜县| 信阳市| 顺平县| 东乡县| 上栗县| 玉龙|