Additional Information

Advantages 
    The diaphragm microporous aerator is the latest aeration device developed in the 1980s. It features small bubble diameter, large gas-liquid interface area, uniform bubble diffusion, no pore clogging, and strong corrosion resistance. Tests conducted by the School of Environmental Engineering at Tongji University in Shanghai and the North China Municipal Engineering Design Institute on oxygen transfer in clean water and wastewater, along with over 50 users' years of satisfactory operation, demonstrate its excellent performance (40% energy reduction compared to conventional fixed spiral aerators, diffused aeration devices, and perforated pipe aerators, or a 40% increase in wastewater treatment capacity). It is particularly suitable for new and expanded urban wastewater and large factory aeration tanks, as well as the renovation of old aeration tanks, and the aeration tank can operate intermittently.

Aeration Pipeline Connection and Installation
    The aeration system consists of aerators, air distribution pipes, tees, elbows, regulators, connectors, and cleaning devices. The air distribution pipes are typically arranged in a ring layout, with aerator density based on air supply and tank shape. Aerators and air distribution pipes are connected via G3/4 threaded connections, with the base having internal threads (fixed to the air distribution pipe) and the aerator having external threads. During installation, first secure the regulator to the tank bottom with expansion bolts according to the required dimensions, then fix the air distribution pipe to the regulator using clamps. To prevent damage from other operations such as welding sparks and construction activities like concrete pouring, aerators should be installed after civil works are completed and before filling the tank with water. To check for leaks in pipes and connections, fill the tank with water to a level 10 cm above the aerators and conduct a pressure test. If any leaks are found in the pipe connections, address them promptly before正式 commissioning.

Main Technical Parameters
    Aerator specifications: 260 type, 215 type                                           Oxygen utilization rate: (water depth 3.2mm) 18.4-27.7%
    Service area: 0.35-0.75m2/unit, 0.25-0.55m2/unit               Oxygenation capacity: 0.112-0.185 KgO2/m3h
    Average pore size of aeration membrane during operation: 80-100 microns                            Oxygenation efficiency: 4.46-5.19 KgO2/m3h
    Air flow rate: 1.5-3 m3/unit h                                                    Aeration resistance: 180-280 mmH2O
    Overall oxygen transfer coefficient: kLa(20°C) 0.204-0.337 min?1
    The air pipe design should consider pressure balance, preferably forming a ring network. Each inlet pipe should have a valve to facilitate air flow regulation. The design velocity for air pipes: main pipes 10-15 m/s; branch pipes 5 m/s. Installation height of aerator surface from tank bottom: 270mm, 250mm, and 200mm for push-plate type.

Industry Category Chemicals/Organosilicon/Siloxanes
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 昌黎县| 个旧市| 于田县| 德州市| 钦州市| 阿拉善右旗| 裕民县| 汨罗市| 辰溪县| 格尔木市| 大新县| 衡水市| 新昌县| 宜兰县| 灌南县| 凤翔县| 二手房| 左权县| 广宁县| 叙永县| 桂林市| 湛江市| 札达县| 岳池县| 商城县| 河池市| 岑溪市| 驻马店市| 宜黄县| 池州市| 兰坪| 琼海市| 嘉兴市| 阿克| 兰州市| 曲阜市| 正镶白旗| 柯坪县| 扎鲁特旗| 阿坝县| 科技|