尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Stepped Bridge - China Supplier
China Stepped Bridge - China Supplier

Stepped Bridge

Price:Negotiable
Industry Category: Others
Product Category:
Brand:
Spec:


Contact Info
  • Add:武漢市硚口區(qū)古田二路海爾國際廣場9號樓1910, Zip:
  • Contact: 徐遠(yuǎn)龍
  • Tel:15997491217
  • Email:2742197770@qq.com

Other Products

Description
Additional Information

What are the key installation points for ladder-type cable trays?

1. The routing of ladder-type cable trays and wireways should be short and direct, preferably installed along walls, columns, or beams.

2. Based on the intended routing of cable trays and wireways, the civil and structural engineering disciplines should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with routing and equipment selection appropriately determined according to different structural types and building layouts.

4. Cables of different voltages and purposes should not be installed on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are installed in the same cable tray, a partition should be added in between for isolation.

5. When additional concentrated loads are not considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder-type cable tray shall be calculated based on the even distribution of cable weight.

6. Ladder-type cable trays should not be laid parallel to the following pipelines. If unavoidable, the location of the cable tray shall meet the following requirements, or corresponding protective measures shall be taken.

(1) Cable trays should be above corrosive liquid pipelines.

(2) Cable trays should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, cable trays should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, cable trays should be below the pipeline.

(5) For the minimum distance between cable trays and pipelines, refer to relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should comply with relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should conform to relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 岐山县| 青河县| 瓮安县| 昌都县| 馆陶县| 深州市| 红原县| 股票| 乐山市| 桐城市| 邻水| 延庆县| 遂昌县| 江永县| 嘉义市| 定兴县| 宁远县| 乐都县| 廊坊市| 榆社县| 梅河口市| 张掖市| 呼伦贝尔市| 乐昌市| 华宁县| 赤壁市| 绍兴市| 晋州市| 西充县| 普兰店市| 和顺县| 余庆县| 蒲江县| 沂水县| 游戏| 巴楚县| 南康市| 景宁| 定南县| 汶川县| 买车|