What are the key points for installing ladder-type cable trays?

1. The routing of ladder-type cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the intended routing of cable trays and wireways, the civil and structural engineering disciplines should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with routes and equipment selection rationally determined according to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are laid in the same cable tray, a partition should be added in between for isolation.

5. When no additional concentrated loads are considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder-type cable tray should be calculated based on the even distribution of the cable's self-weight.

6. Ladder-type cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) Refer to relevant standards for the minimum distance between cable trays and pipelines.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should comply with relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should conform to relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 青神县| 怀来县| 延津县| 盘锦市| 南昌县| 文水县| 泰州市| 永胜县| 山东省| 宁安市| 衡山县| 蓬安县| 安平县| 平湖市| 江门市| 彭山县| 万安县| 通许县| 绥阳县| 江津市| 简阳市| 湖南省| 罗城| 崇阳县| 会泽县| 分宜县| 福州市| 辽阳县| 商都县| 岳普湖县| 东光县| 富川| 合山市| 常山县| 宜川县| 长垣县| 岚皋县| 星子县| 百色市| 塘沽区| 阳山县|