尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Stepped Bridge - China Supplier
China Stepped Bridge - China Supplier

Stepped Bridge

Price:Negotiable
Industry Category: Others
Product Category:
Brand:
Spec:


Contact Info
  • Add:武漢市硚口區(qū)古田二路海爾國際廣場9號樓1910, Zip:
  • Contact: 徐遠(yuǎn)龍
  • Tel:15997491217
  • Email:2742197770@qq.com

Other Products

Description
Additional Information

What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably installed along walls, columns, or beams.

2. Based on the installation direction of cable trays and wireways, the civil and structural engineering teams should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical engineering disciplines is essential.

3. The wiring of underground concealed metal wireways must be closely coordinated with civil engineering design, with route planning and equipment selection tailored to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are installed in the same cable tray, a partition should be added in between for isolation.

5. When no additional concentrated load is considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 墨江| 福泉市| 怀集县| 阳朔县| 巴林右旗| 汝南县| 德钦县| 扬中市| 邛崃市| 从江县| 新竹市| 江华| 延长县| 兰州市| 通渭县| 拉孜县| 盐边县| 工布江达县| 铅山县| 普陀区| 海伦市| 邢台县| 泸定县| 遂川县| 元氏县| 新昌县| 塘沽区| 嘉义县| 普安县| 张家口市| 岚皋县| 巴彦县| 深泽县| 咸宁市| 汉寿县| 正定县| 六枝特区| 达拉特旗| 新兴县| 吉木萨尔县| 伊宁县|