What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the routing direction of cable trays and wireways, the civil and structural disciplines should propose the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring of underground concealed metal wireways should be closely coordinated with the civil design discipline, with routes and equipment selection reasonably determined according to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are laid on the same cable tray, a partition should be added in between for isolation.

5. When additional concentrated loads are not considered during installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray should meet the following requirements, or corresponding protective measures should be taken.

(1) Cable trays should be above corrosive liquid pipelines.

(2) Cable trays should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, cable trays should be above the pipelines.

(4) When flammable and explosive gases are lighter than air, cable trays should be below the pipelines.

(5) For the minimum distance between cable trays and pipelines, refer to relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should comply with relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 柯坪县| 介休市| 开封县| 永春县| 东兴市| 栾城县| 滕州市| 达尔| 武威市| 邓州市| 南岸区| 柳林县| 西平县| 哈密市| 龙岩市| 蕲春县| 迁西县| 和静县| 桑日县| 永清县| 交口县| 探索| 东乡| 正宁县| 台北市| 陇川县| 揭东县| 神池县| 临沧市| 德化县| 芮城县| 弥渡县| 定远县| 大兴区| 潮安县| 民和| 江源县| 车致| 凤阳县| 勐海县| 海城市|