Additional Information

What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the routing direction of cable trays and wireways, the civil and structural engineering disciplines should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with routes and equipment selection rationally determined according to different structural types and building layouts.

4. Cables of different voltages and purposes should not be laid on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different classes are laid on the same cable tray, a partition should be added in the middle for isolation.

5. When no additional concentrated load is considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray is calculated based on the even distribution of the cable's self-weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) The cable tray should be above corrosive liquid pipelines.

(2) The cable tray should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, the cable tray should be above the pipeline.

(4) When flammable and explosive gases are lighter than air, the cable tray should be below the pipeline.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 醴陵市| 崇阳县| 浦城县| 图木舒克市| 琼海市| 南开区| 新邵县| 油尖旺区| 临武县| 原平市| 琼海市| 库尔勒市| 洮南市| 辽阳市| 黄骅市| 临汾市| 达尔| 锡林郭勒盟| 承德县| 山阳县| 天峨县| 时尚| 牡丹江市| 昌江| 津南区| 水城县| 资溪县| 大竹县| 绩溪县| 鄂尔多斯市| 静乐县| 旅游| 新干县| 松溪县| 玉屏| 延边| 当雄县| 成都市| 临安市| 高安市| 寻甸|