Additional Information

What are the key installation points for ladder cable trays?

1. The routing of ladder cable trays and wireways should be short and direct, preferably along walls, columns, or beams.

2. Based on the installation path of cable trays and wireways, the civil and structural engineering teams should specify the locations and load requirements for reserved wall openings, floor openings, and embedded steel plates for hanger installation. Coordination with process engineering, plumbing, and electrical disciplines is essential.

3. The wiring design for underground concealed metal wireways must be closely coordinated with civil engineering, with routes and equipment selection rationally determined according to structural types and building layouts.

4. Cables of different voltages and purposes should not be installed on the same layer of a cable tray:

(1) Cables above 1kV and below 1kV;

(2) Dual-circuit cables supplying power to primary loads on the same path;

(3) Emergency lighting and other lighting cables;

(4) Power, control, and telecommunication cables. If cables of different ratings are installed in the same cable tray, a partition should be added in between for isolation.

5. When no additional concentrated loads are considered for installation or maintenance under engineering conditions, the working uniformly distributed load of the ladder cable tray should be calculated based on the even distribution of cable weight.

6. Ladder cable trays should not be laid parallel to the following pipelines. If unavoidable, the position of the cable tray must meet the following requirements, or corresponding protective measures should be taken.

(1) Cable trays should be above corrosive liquid pipelines.

(2) Cable trays should be below thermal pipelines.

(3) When flammable and explosive gases are heavier than air, cable trays should be above the pipelines.

(4) When flammable and explosive gases are lighter than air, cable trays should be below the pipelines.

(5) The minimum distance between cable trays and pipelines should comply with relevant standards.

(6) A necessary distance should be maintained between integrated wiring cables and electrical equipment that may generate high-level electromagnetic interference (such as motors and power transformers). The spacing between integrated wiring cables and power cables should meet relevant regulations.

(7) The distance between integrated wiring cables, optical cables, and conduits installed on walls and other pipelines should comply with relevant regulations.

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 娄烦县| 玉溪市| 盱眙县| 凤庆县| 喜德县| 大足县| 旬阳县| 芜湖市| 开原市| 大竹县| 伊金霍洛旗| 山阳县| 如东县| 叶城县| 中阳县| 新蔡县| 会泽县| 绥芬河市| 咸阳市| 松原市| 田东县| 佛坪县| 凉山| 濮阳县| 利川市| 东阿县| 锡林郭勒盟| 偃师市| 台中市| 蓝田县| 巴东县| 红桥区| 堆龙德庆县| 环江| 九寨沟县| 哈巴河县| 阿合奇县| 滁州市| 隆子县| 南京市| 六盘水市|