尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Design and Construction of TFT LCD Cleanroom - China Supplier
China Design and Construction of TFT LCD Cleanroom - China Supplier

Design and Construction of TFT LCD Cleanroom

Price:Negotiable
Industry Category: Others
Product Category:
Brand:
Spec:


Contact Info
  • Add:江西省南昌市青山湖區(qū), Zip:
  • Contact: 何工
  • Tel:13027287520
  • Email:

Other Products

Description
Additional Information

Thin-Film Transistor Liquid Crystal Display (TFT-LCD) Factory Facility Requirements:

The design of a TFT-LCD factory shall meet the requirements for an ultra-large cleanroom environment necessary for TFT-LCD production.

The main production processes should be complete and well-supported. The array, color filter, and cell processes should preferably be located within the same factory site.

In addition to complying with the relevant provisions of the current national standard "Design Code for Cleanrooms in Electronic Industry," the principle of separate purification air conditioning systems shall also adhere to the following regulations:

1. Cleanrooms with significantly different baseline temperature and humidity should have separate purification air conditioning systems;

2. Cleanrooms with significantly different allowable fluctuations in temperature and humidity should have separate purification air conditioning systems.

The fresh air for the purification air conditioning system should undergo centralized thermal, humidity, and purification treatment. The installation of fresh air handling units shall comply with the following provisions:

1. Supply fans should adopt variable frequency measures;

2. Air should be treated through three stages of filtration: primary, medium, and high-efficiency filters;

3. Backup fresh air handling units should be installed for array, color filter, and cell factories;

4. Motors and fans in array, color filter, and cell factories should adopt direct drive methods with effective vibration damping measures;

5. The fresh air intake location should be far from exhaust outlets emitting harmful or combustible substances;

6. Humidification should preferably use warm water spray chambers;

7. Good airtightness should be ensured, with an air leakage rate not exceeding 1% under working pressure.

The recirculated air for the purification air conditioning systems in array, color filter, and cell factories should preferably be treated using fan filter units (FFUs) and dry cooling coils. The recirculated air for module and backlight factories should preferably be treated using recirculated air handling units.

The installation of dry cooling coils shall comply with the following provisions:

1. The face velocity should not exceed 2.5 m/s;

2. The air-side resistance should not exceed 40 Pa;

3. Dry cooling coils arranged in the same cleanroom (area) should not have an air-side resistance difference exceeding 10% under working conditions;

4. The supply water temperature for chilled water should be higher than the dew point temperature in the cleanroom (area);

5. Dry cooling coils should be equipped with drainage systems, and non-floor-mounted dry cooling coils should have drain pans.

The installation of fan filter units (FFUs) shall comply with the following provisions:

1. Selection should be based on air cleanliness等級(jí) and supply air volume;

2. DC speed control motors should preferably be used;

3. Units should adopt noise reduction measures; noise reduction devices should not use dust-generating materials and must achieve a combustion performance等級(jí) of Class B;

4. Cleanrooms (areas) with cleanliness等級(jí) of Class 7 to 9 should not use filters made of PTFE filter media;

5. Units should facilitate installation, maintenance, and filter replacement.

When using a purification air conditioning system composed of fresh air handling units + fan filter units (FFUs) + dry cooling coils, the air velocity in various parts of the clean area shall comply with the following provisions:

1. The upper technical plenum should not exceed 4 m/s;

2. The lower technical plenum should not exceed 3 m/s;

3. The return air plenum should not exceed 4 m/s.

Relevant Standards:

GB 50472-2008 Design Code for Cleanrooms in Electronic Industry

GB 51136-2015 Design Code for TFT-LCD Factories

GB 50073-2013 Design Code for Cleanrooms

GB 51110-2015 Code for Construction and Quality Acceptance of Cleanrooms

GB 50019-2015 Design Code for Heating, Ventilation, and Air Conditioning of Industrial Buildings

GB 50243-2016 Code for Acceptance of Construction Quality of Ventilation and Air Conditioning Works

GB 50016—2014 (2018 Edition) Code for Fire Protection Design of Buildings

Industry Category Others
Product Category
Brand:
Spec:
Stock:
Origin: China / Jiangxi / Nanchangshi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 兴隆县| 长白| 防城港市| 崇明县| 黄石市| 阳高县| 凤冈县| 南阳市| 泉州市| 景谷| 寿光市| 舟山市| 深州市| 从化市| 吴桥县| 湖州市| 临邑县| 名山县| 古交市| 绥化市| 武宁县| 靖江市| 孟州市| 贵阳市| 东方市| 津市市| 双牌县| 定远县| 乌拉特前旗| 独山县| 金乡县| 北安市| 隆子县| 景德镇市| 上饶县| 张北县| 马龙县| 临沂市| 西和县| 松阳县| 泸定县|