尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Steel Cable Tray Powder Coating - China Supplier
China Steel Cable Tray Powder Coating - China Supplier

Steel Cable Tray Powder Coating

Price:Negotiable
Industry Category: Hardware & Tools/Cutting Power Tools/Drill Bits
Product Category:
Brand:
Spec:


Contact Info
  • Add:揚中市三茅街道創(chuàng)業(yè)南路16號, Zip: 212200
  • Contact: 朱經(jīng)理
  • Tel:0511-88332814
  • Email:1427901080@qq.com

Other Products

Description
Additional Information


Fiberglass reinforced plastic (FRP) cable trays refer to cable ladders, cable trays, and metal wire ducts. FRP cable trays are mainly made of steel, aluminum alloy, and fiberglass reinforced plastic. The surface treatment of FRP cable trays includes painting, powder coating, electro-galvanizing, hot-dip galvanizing, and electrostatic powder spraying. The installation of cable trays mainly involves installation along the ceiling, horizontal and vertical installation along walls, installation along shafts, installation along the ground, and installation along cable trenches and pipe supports. The supports (hangers) used for installation can be either pre-fabricated or custom-made. The fixing methods for supports (hangers) mainly include welding on pre-embedded iron parts and expansion bolt fixation. The installation of steel cable trays must comply with the following regulations:
1. When the length of a straight steel cable tray exceeds 30m, or the length of an aluminum alloy or FRP cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be set at building deformation joints for FRP cable trays.
2. Hangers or supports should be installed at the following locations for FRP cable trays:
2.1 At both ends of the cable tray joint, 0.5m from each end;
2.2 At intervals of 1.5 to 3m;
2.3 At turns;
2.4 Every 1.5 meters for vertical cable trays.
3. Hangers and supports should be installed vertically, neatly, and firmly, without any tilting.
4. Bolts on the cable tray connection plate should be tightly fastened without omission, and nuts should be located on the outside of the tray.
5. Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines.
6. Metal cable trays and their supports should be grounded or connected to zero at no fewer than two points along their entire length.
7. Connection plates between metal cable trays should have no fewer than two locking nuts or lock washers at both ends, and a copper grounding wire with a cross-section of no less than 4mm2 should be connected across both ends.
8. The installation of cable trays should meet the following requirements:
8.1 The left-right deviation of the cable tray should not exceed 50mm;
8.2 The horizontal deviation per meter of the cable tray should not exceed 2mm;
8.3 The vertical deviation of the cable tray should not exceed 3mm.
9 Steel cable trays should be installed below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from pipelines should comply with relevant regulations.

Industry Category Hardware & Tools/Cutting Power Tools/Drill Bits
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 鹿泉市| 固安县| 南乐县| 临潭县| 平原县| 东宁县| 东光县| 察雅县| 贵南县| 札达县| 灵武市| 遵义县| 无锡市| 油尖旺区| 土默特左旗| 平罗县| 专栏| 株洲县| 南皮县| 周口市| 本溪| 三门峡市| 锡林浩特市| 巴青县| 莱阳市| 西宁市| 大丰市| 永靖县| 朝阳市| 长寿区| 凤台县| 衡山县| 西宁市| 高阳县| 方城县| 兴安盟| 枣庄市| 宾川县| 辛集市| 山东省| 台江县|