Steel Cable Tray Powder Coating

Price:Negotiable
Industry Category: Hardware & Tools/Cutting Power Tools/Drill Bits
Product Category:
Brand:
Spec:


Contact Info
  • Add:揚中市三茅街道創(chuàng)業(yè)南路16號, Zip: 212200
  • Contact: 朱經(jīng)理
  • Tel:0511-88332814
  • Email:1427901080@qq.com

Other Products

Description
Additional Information


Fiberglass reinforced plastic (FRP) cable trays refer to cable ladders, cable trays, and metal wire ducts. FRP cable trays are mainly made of steel, aluminum alloy, and fiberglass reinforced plastic. The surface treatment of FRP cable trays includes painting, powder coating, electro-galvanizing, hot-dip galvanizing, and electrostatic powder spraying. The installation of cable trays mainly involves installation along the ceiling, horizontal and vertical installation along walls, installation along shafts, installation along the ground, and installation along cable trenches and pipe supports. The supports (hangers) used for installation can be either pre-fabricated or custom-made. The fixing methods for supports (hangers) mainly include welding on pre-embedded iron parts and expansion bolt fixation. The installation of steel cable trays must comply with the following regulations:
1. When the length of a straight steel cable tray exceeds 30m, or the length of an aluminum alloy or FRP cable tray exceeds 15m, expansion joints should be installed. Compensation devices should be set at building deformation joints for FRP cable trays.
2. Hangers or supports should be installed at the following locations for FRP cable trays:
2.1 At both ends of the cable tray joint, 0.5m from each end;
2.2 At intervals of 1.5 to 3m;
2.3 At turns;
2.4 Every 1.5 meters for vertical cable trays.
3. Hangers and supports should be installed vertically, neatly, and firmly, without any tilting.
4. Bolts on the cable tray connection plate should be tightly fastened without omission, and nuts should be located on the outside of the tray.
5. Cable trays should be laid below flammable and explosive gas pipelines and thermal pipelines.
6. Metal cable trays and their supports should be grounded or connected to zero at no fewer than two points along their entire length.
7. Connection plates between metal cable trays should have no fewer than two locking nuts or lock washers at both ends, and a copper grounding wire with a cross-section of no less than 4mm2 should be connected across both ends.
8. The installation of cable trays should meet the following requirements:
8.1 The left-right deviation of the cable tray should not exceed 50mm;
8.2 The horizontal deviation per meter of the cable tray should not exceed 2mm;
8.3 The vertical deviation of the cable tray should not exceed 3mm.
9 Steel cable trays should be installed below flammable and explosive gas pipelines and thermal pipelines. When there are no design requirements, the minimum clear distance from pipelines should comply with relevant regulations.

Industry Category Hardware & Tools/Cutting Power Tools/Drill Bits
Product Category
Brand:
Spec:
Stock:
Origin:
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 北安市| 兰考县| 逊克县| 高淳县| 威海市| 新蔡县| 四川省| 玉屏| 东乌珠穆沁旗| 阿坝县| 瓮安县| 珠海市| 惠东县| 雅江县| 资溪县| 囊谦县| 濮阳县| 白山市| 都江堰市| 翁源县| 宝清县| 屏东市| 神农架林区| 岳池县| 松原市| 新兴县| 南汇区| 绥江县| 松原市| 南丹县| 和政县| 南昌县| 小金县| 孟连| 乐安县| 得荣县| 平利县| 大丰市| 隆回县| 马尔康县| 绥棱县|