尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier
China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier China Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument - China Supplier

Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument

Price:Negotiable
Industry Category: Instruments & Meters/Analytical Instruments/Other Analytical Instruments
Product Category:
Brand: 標(biāo)創(chuàng)儀器
Spec: DT-6500


Contact Info
  • Add:鶴壁市山城區(qū)朝陽(yáng)街東段, Zip: 458000
  • Contact: 周經(jīng)理
  • Tel:13503920302
  • Email:

Other Products

Description
Additional Information

Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument Fully Automatic Bauxite Silicon Magnesium Aluminum Iron Titanium Detection Instrument Bauxite Testing Instrument Fully Automatic Bauxite Analysis Equipment High-Precision Bauxite Detection Instrument


1 Power Switch: Used to turn the entire machine's power on or off

2 Cuvette: Used to hold the colorimetric solution

3 Drain Button: Drains the solution from the cuvette

4 Display: Shows the instrument's operation interface.

5 Main Unit: Computer main chassis.

Chapter 3 Basic Usage of the Instrument

I. Connection and Power-On of the Instrument

Connect the main unit's power socket to the mains power supply using the power cord, and ensure the instrument is reliably grounded (otherwise, it may be susceptible to interference, causing data fluctuations); check if the drainage hose is securely installed (do not submerge the outlet end of the drainage hose into the waste liquid to avoid poor drainage), and fill the cuvette with distilled water (reference solution). Turn on the computer power, run the element analyzer application, and then turn on the instrument's power switch.

II. Establishment of the Calibration Curve

Establish the calibration curveOn the main interface, select the element symbol to be calibrated, click Calibrate to enter the calibration interface

Step 1: Click Full Scale (100)-----Drain water and pour in the solution------Click A Value Input------Enter the calibration value-----Click C Value % Input.

Step 2: Enter the weight value of the analytical standard sample in mg.

Step 3: Click Establish Curve. If saving other curves, change the curve number.

For multi-point calibration, repeat Step 1. Only after the calibration curve is established within the instrument can sample testing be performed.

Industry Category Instruments & Meters/Analytical Instruments/Other Analytical Instruments
Product Category
Brand: 標(biāo)創(chuàng)儀器
Spec: DT-6500
Stock: 16
Manufacturer:
Origin: China / Henan / Hebishi
About Toocle.com - Partner Programme - Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 刚察县| 日喀则市| 安康市| 大兴区| 恩施市| 澳门| 隆林| 库尔勒市| 昭苏县| 香港 | 正阳县| 安多县| 乌什县| 高淳县| 迁安市| 蒙阴县| 金平| 广元市| 利川市| 福泉市| 定远县| 麻江县| 乌拉特中旗| 太保市| 林口县| 江油市| 通海县| 德令哈市| 江西省| 久治县| 安平县| 临安市| 获嘉县| 茌平县| 碌曲县| 冕宁县| 龙州县| 泰和县| 乌兰浩特市| 宜州市| 宜春市|