尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Polymer Cast-in-Place Tactile Paving Construction - China Supplier
China Polymer Cast-in-Place Tactile Paving Construction - China Supplier China Polymer Cast-in-Place Tactile Paving Construction - China Supplier China Polymer Cast-in-Place Tactile Paving Construction - China Supplier China Polymer Cast-in-Place Tactile Paving Construction - China Supplier China Polymer Cast-in-Place Tactile Paving Construction - China Supplier

Polymer Cast-in-Place Tactile Paving Construction

Price:¥65 /m
Industry Category: Chemicals/Chemical Intermediates/Intermediate Compounds
Product Category:
Brand:
Spec: 110


Contact Info
  • Add:, Zip:
  • Contact: 李想
  • Tel:13223760833
  • Email:

Other Products

Description
Additional Information

Product Advantages: Aesthetic, durable, short construction period, the entire pavement can be formed in one go (cast-in-place tactile paving can be directly laid on the completed pavement, avoiding the hassle of secondary paving typically caused by the obstruction of traditional tactile paving bricks), significantly reducing pavement construction costs and material waste. Various colors and styles are available for flexible matching.







Product Description: Polymer cast-in-place diamond tactile paving is a continuous tactile paving system made from inorganic high-strength polymer materials combined with specialized molds, constructed on existing pavements through cast-in-place methods. It is divided into two types: guidance strips and guidance points. Standard widths include 300mm, 400mm, 500mm, and 600mm, with flexible customization available based on actual needs. It forms a permanent bond with asphalt concrete or cement concrete base layers, offering wear resistance, slip resistance, stain resistance, and synchronous expansion and contraction with asphalt pavement.

II. Construction Process and Operation Methods

Polymer cast-in-place diamond tactile paving is a new tactile paving technology that can be constructed on-site on traditional black asphalt concrete and gray cement concrete pavements.

2.1 Construction Process

Base layer inspection - Base layer cleaning and treatment - Layout marking - Tape application - Base leveling and mortar spreading - Mold placement - Filling with diamond tactile paving mortar - Leveling and finishing - Curing to specified time - Surface cleaning - Application of sealant for surface sealing - Drying and curing - Inspection and acceptance - Opening to traffic - Final acceptance.

2.2 Construction Equipment and Tools

The construction process for diamond tactile paving is relatively simple, requiring only the following equipment and tools: one mixer, one disperser, several tactile paving molds, one material transport vehicle, rolling rollers, specialized toothed rubber screeds and flat rubber screeds, one high-power blower, one generator, brooms, and other general equipment and tools.

2.3 Construction Personnel

One team leader and 5-6 construction workers per group.

2.4 Construction Preparation

4.1 Review drawings and layout marking

Carefully review construction drawings and verify positions on-site one by one. If necessary, mark points and apply tape.

4.2 Material inspection

Polymer cast-in-place diamond tactile paving is an on-site constructed ground system involving multiple processes and materials. Before construction, ensure material consistency and compatibility. Emulsion materials should show no significant skinning, clumping, or abnormalities; powder materials should be free of clumps. 2.4.3 Trial mixing and sample preparation

Different base layers and environments can affect the curing time of polymer diamond tactile paving. Therefore, before formal construction, conduct on-site trials strictly following the mix ratio and methods set for batch operations. Proceed with batch operations only after ensuring no significant defects in curing.

2.4.4 Base layer conditions and treatment

The base layer should be solid and clean. Asphalt concrete pavement should be free of bleeding, loose dust, delamination, or particle shedding.





For cement concrete pavement, if the strength is below C25, the surface should be treated by milling, scabbling, grinding, sandblasting, or roughening (for newly poured concrete), preferably exposing the aggregate over a large area. Additionally, apply 1-2 coats of PM-101 penetrating sealant for sealing treatment.



Clean, dry asphalt pavement in good functional condition does not require sealing treatment.

Industry Category Chemicals/Chemical Intermediates/Intermediate Compounds
Product Category
Brand:
Spec: 110
Stock: 888888
Manufacturer:
Origin: China / Shanghai / Baoshanqu
About Toocle.com -  Toocle Partnership -  Toocle Services -  Old Version
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營(yíng)性-2023-0192
ChatGlobal Chat Now 宁明县| 桐梓县| 石泉县| 木兰县| 丹巴县| 吉木乃县| 临夏县| 博野县| 博野县| 思茅市| 高邑县| 西吉县| 东乌珠穆沁旗| 分宜县| 绥阳县| 大宁县| 志丹县| 景泰县| 绩溪县| 镇原县| 台中县| 瑞丽市| 伊金霍洛旗| 长子县| 台安县| 寿宁县| 清丰县| 新安县| 铜鼓县| 连平县| 富锦市| 佛学| 高邮市| 黑河市| 武功县| 阿拉善左旗| 五大连池市| 宝应县| 凤冈县| 余干县| 万荣县|