尤物视频污,99热99热99超碰,精品久久久久女少妇,少妇精品无码,日B视屏久久香色,亚洲美女午夜福利av,国产美女被操,国产九九精品,国产久久色情

China Infinitely Extendable Flood Control Sub-Dyke Image Price - China Supplier
China Infinitely Extendable Flood Control Sub-Dyke Image Price - China Supplier China Infinitely Extendable Flood Control Sub-Dyke Image Price - China Supplier China Infinitely Extendable Flood Control Sub-Dyke Image Price - China Supplier China Infinitely Extendable Flood Control Sub-Dyke Image Price - China Supplier China Infinitely Extendable Flood Control Sub-Dyke Image Price - China Supplier

Infinitely Extendable Flood Control Sub-Dyke Image Price

Price:1
Industry Category: Others
Product Category:
Brand:
Spec:


Contact Info
  • Address:長(zhǎng)安區(qū)東勝廣場(chǎng)B座1008, Zip:
  • Contact: 趙佳娜
  • Tel:15533661522
  • Email:

Other Products

Description
Additional Information

[Five-Star] Assembled Panel Dam Flood Control Sub-dike is mainly used for emergency flood overtopping control on soft and hard dikes such as sandy loam, loam, clay, concrete, and asphalt.
II. Main Features of the Flood Control Sub-dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-dike from Hebei Five-Star Power Equipment Co., Ltd. is a new, fast, low-cost, and environmentally friendly disaster prevention and mitigation device that breaks through traditional thinking modes and abandons traditional dike-building materials and processes. It features water control using water, high efficiency and speed; flexible dam assembly and strong adaptability; easy storage and transportation with low cost; recyclable and reusable, green and environmentally friendly, among other characteristics.
III. Main Specifications of the Assembled Panel Dam Flood Control Sub-dike
1. Sub-dike dimensions: 1.2 m * 10 m;
2. Sub-dike unit width: 1 m;
3. Applicable dike materials: sandy loam, loam, clay/concrete, asphalt;
4. Sub-dike height: 1.30/1.35 m;
5. Water retention height: 1.0 m;
6. Original dike top width: 4.0 m or more;
7. Safety factor k: 2.0-3.35;
8. Design wind speed: 6.0 m/s;
9. Design river width/wave height: 4 km/0.3 m;
10. Gross weight: 260 kg;
11. Net weight: 225 kg;
12. Construction speed: 60 minutes for 100 people/km
IV. Structural Principle of the Assembled Panel Dam Flood Control Sub-dike
1. Structure and Function of the [Five-Star] Assembled Panel Dam Flood Control Sub-dike
The [Five-Star] Assembled Panel Dam Flood Control Sub-dike mainly consists of two parts:
(1) Sub-dike support angle frame: Made of aluminum alloy profiles connected by shafts, it is directly installed behind the water-retaining panel using a rotating shaft. It can be folded together with the panel when not in use and quickly deployed as the support framework of the dam body when needed. The beam connecting rod: Made of aluminum alloy square materials connected with special joints, it serves as the connecting support member of the dam body.
(2) Foldable water-retaining panel: The exclusively developed foldable water-retaining panel by [Five-Star] uses connecting shafts to join multiple panels into an integrated unit. When not in use, several panels can be folded together to save space. When deployed, it can be instantly unfolded to enhance assembly speed. The foldable water-retaining panel is made of corrugated fiberglass material or specially designed color steel plates, aluminum alloy plates, and waterproof PVC plates, which are connected to the beam as a whole using special fixing devices. Its functions: first, as a connecting piece to link adjacent angle frames, forming the load-bearing carrier of the dam body; second, as a rigid connecting plate. The bottom of the panel is equipped with positioning fixing piles, formed by pressed round steel. Depending on the dike foundation, there are two usage methods: when applied on soft dike foundations, it is inverted in the trench to resist displacement; when applied on hard dike foundations, it serves to position, retain water, prevent seepage, and compact the water-sealing elastomer.
V. Working Principle of the Assembled Panel Dam Flood Control Sub-dike from Hebei Five-Star Power Equipment Co., Ltd.
The [Five-Star] Assembled Panel Dam Flood Control Sub-dike adopts the principle of panel dams in hydraulic engineering. It forms a rigid sub-dike body by connecting and fastening multiple angle frames, beams, and foldable water-retaining support panels. The water-retaining support panel functions as the water-retaining face of the panel dam. 

Industry Category: Others
Product Category:
Brand:
Spec:
Stock:
Origin:
Storefront Language: English English Chinese
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright ? Toocle.com. All Rights Reserved.
(浙)-經(jīng)營性-2023-0192
ChatGlobal Chat Now 定南县| 洱源县| 绥化市| 望城县| 阳江市| 桑植县| 铜川市| 文山县| 海口市| 大关县| 南宁市| 安义县| 晋州市| 泸西县| 建阳市| 卓资县| 大关县| 云霄县| 汾阳市| 新源县| 斗六市| 蒲江县| 巩义市| 六枝特区| 甘孜县| 青岛市| 班玛县| 利川市| 贺兰县| 舞阳县| 南和县| 随州市| 凌源市| 田林县| 海淀区| 金阳县| 枣强县| 龙口市| 若尔盖县| 沙坪坝区| 鸡东县|